Solar · charging

What Size Solar Panel to Charge a 12V 50Ah Battery?

To refill a 12 V 50 Ah battery (600 Wh) from empty in one sunny day you need about 160 W of solar panels in June, and about 250 W in December, in Tennessee (the middle state for sunshine). A 100 W panel takes about 1.5 days in June and 2.5 days in December.

June1.5 dayswith 100 W
December2.5 dayswith 100 W
Refill in a day160 Win June
Refill in a day250 Win December

Your state, your battery

Your situation: charging a battery or power station with solar. Different situation?

1

Your power station or battery

Battery size in

On the box: a station’s Wh is its battery; a panel’s W is its rated output. A 12 V 100 Ah battery is 1,200 Wh.

2

Where and how

Month by month in Tennessee

MonthDays to fullLying flat
January2.3 days3.4 days
February2.1 days2.8 days
March1.7 days2.1 days
April1.6 days1.6 days
May1.6 days1.6 days
June1.5 days1.5 days
July1.6 days1.6 days
August1.6 days1.6 days
September1.6 days1.8 days
October1.7 days2.3 days
November2.0 days3.0 days
December2.5 days3.9 days

Every state

StateBest monthWorst monthPanel for 1 day, worst month
Alabama1.5 days2.2 days (Dec)230 W
Alaska1.5 days11 days (Dec)1,090 W
Arizona1.2 days1.6 days (Dec)170 W
Arkansas1.5 days2.2 days (Dec)230 W
California1.3 days1.9 days (Dec)190 W
Colorado1.4 days1.8 days (Dec)180 W
Connecticut1.5 days2.5 days (Dec)250 W
Delaware1.5 days2.4 days (Dec)250 W
District of Columbia1.6 days2.3 days (Dec)240 W
Florida1.4 days1.9 days (Dec)190 W
Georgia1.5 days2.1 days (Dec)220 W
Hawaii1.4 days1.9 days (Dec)190 W
Idaho1.2 days3.2 days (Dec)330 W
Illinois1.5 days3.0 days (Dec)300 W
Indiana1.5 days3.1 days (Dec)320 W
Iowa1.5 days2.8 days (Dec)290 W
Kansas1.5 days2.1 days (Dec)220 W
Kentucky1.5 days2.8 days (Dec)290 W
Louisiana1.5 days2.1 days (Dec)220 W
Maine1.6 days2.8 days (Dec)280 W
Maryland1.6 days2.4 days (Dec)240 W
Massachusetts1.6 days2.6 days (Dec)270 W
Michigan1.5 days3.9 days (Dec)390 W
Minnesota1.5 days3.1 days (Dec)310 W
Mississippi1.5 days2.2 days (Dec)230 W
Missouri1.5 days2.4 days (Dec)240 W
Montana1.3 days3.2 days (Dec)320 W
Nebraska1.5 days2.4 days (Dec)250 W
Nevada1.2 days1.7 days (Dec)170 W
New Hampshire1.6 days2.6 days (Dec)270 W
New Jersey1.6 days2.5 days (Dec)260 W
New Mexico1.2 days1.6 days (Dec)160 W
New York1.5 days2.5 days (Dec)250 W
North Carolina1.5 days2.1 days (Dec)210 W
North Dakota1.4 days3.2 days (Dec)320 W
Ohio1.5 days3.5 days (Dec)350 W
Oklahoma1.4 days2.0 days (Dec)200 W
Oregon1.3 days4.3 days (Dec)440 W
Pennsylvania1.6 days2.6 days (Dec)270 W
Rhode Island1.6 days2.5 days (Dec)250 W
South Carolina1.4 days2.0 days (Dec)210 W
South Dakota1.4 days2.6 days (Dec)260 W
Tennessee1.5 days2.5 days (Dec)250 W
Texas1.5 days2.2 days (Dec)220 W
Utah1.3 days2.6 days (Dec)270 W
Vermont1.5 days4.0 days (Dec)400 W
Virginia1.5 days2.1 days (Dec)220 W
Washington1.3 days4.9 days (Dec)500 W
West Virginia1.6 days3.1 days (Dec)320 W
Wisconsin1.5 days3.1 days (Dec)320 W
Wyoming1.4 days2.1 days (Dec)220 W

FAQ

What Size Solar Panel to Charge a 12V 50Ah Battery?

To refill a 12 V 50 Ah battery (600 Wh) from empty in one sunny day you need about 160 W of solar panels in June, and about 250 W in December, in Tennessee (the middle state for sunshine). A 100 W panel takes about 1.5 days in June and 2.5 days in December.

How long does a 100 W solar panel take to charge a 600 Wh battery?

Days from empty = 600 Wh ÷ (100 W × the day’s solar output per kW × 0.85). In Tennessee that’s 1.5 days in June and 2.5 days in December; lying flat, 3.9 days in December. Your state is in the table.

Does a bigger panel always charge faster?

Only up to the solar input limit of the power station or charge controller (in watts and volts, on its label or manual). Panels beyond that limit add nothing, and exceeding the voltage limit can damage it; check the manual before connecting.

Does it matter if it’s lithium or lead-acid?

Lead-acid batteries shouldn’t be run below about half, so refilling from 50% takes half as long as the figures here; lithium batteries usually charge more efficiently than the 85% we assume. A 50 Ah × 12 V = 600 Wh rating is the full capacity.

Sources and assumptions

Note: These are estimates; shading, roof direction, local weather, equipment and your installer’s design change the real output. We give no wiring or installation advice: follow your equipment’s manuals, and use a licensed installer for any system connected to your home’s wiring or the grid. Net metering and export credits are not modelled. Not financial or tax advice.